With Thermo Fusion, construction and operations costs are scaled down dramatically. The cost to build a nuclear reactor electrical plant to power a large city is approximately $10 Billion USD or more and will take up to (10) years to build compared to our thermo fusion MEGS unit that for smaller communities or industries can be built for a reduced cost and much shorter time line.
Versatility: The thermo fusion MEGS unit is not dependent on any fuels, and therefore can be located remotely to provide a dependable source of electricity.
No uranium or radioactive materials are used to create heat. Therefore, no radioactive waste or other pollution concerns.
Our MEGS units have been developed for the purpose of producing green electricity that is produced without any waste, pollution, or impact to the environment where the only emission is water.
2800 - 10104-103 Avenue NW, Edmonton, Alberta T5J 0H8
#201, 3601 – 82 Avenue, Leduc, Alberta T9E 0H7
© 2022 Copyrights McConnell Moran Technology Corporation. All rights reserved